Guide posts and mechanisms; Hydraulic and moving components; Wear-resistant sliding fits.
45 steel
45 Steel Induction-Hardened Chrome Shaft
Induction hardened before hard chrome plating for applications that need higher surface wear resistance and stable guidance.
Inquire about this product



SPECIFICATIONS
45 Steel Induction-Hardened Chrome Shaft: standard specification
Standard specification. Other sizes, tolerances and chrome layers are quoted against your drawing.
| Grade | Grade 45 to GB/T 699-2015 · comparable, for reference only: C45, S45C, SAE 1045 |
|---|---|
| Diameter | Ø4–130 mm (cold drawn to Ø28, peeled from Ø30) |
| Tolerance | Ø4–11: −0.02/−0.05 mm · from Ø12: 0/−0.02, −0.01/−0.03 or −0.02/−0.05 mm |
| Hardness | Induction-hardened case ≥ HRC55, ≈ 2 mm deep; chrome hardness up to HV800+ |
| Hard chrome | 20–30 μm per side, up to 50 μm on request |
| Surface roughness | Ra ≤ 0.4 μm |
| Straightness | ≈ 0.1 mm/m from Ø25 · ≈ 0.2 mm/m below Ø25 |
| Length & cutting | Standard 1 m; CNC saw cut to length (≈ 3 mm allowance), ends left as sawn |
| Certificates & testing | Steel mill certificate for each heat, forwarded unaltered; foreign grades named here are for reference only; third-party test reports on request |
If substantial turning, milling or drilling is required after supply, review the effect of the hardened case and chrome before selection.
PROCESS ROUTE
How this bar is made
Dashed steps are done by long-term partner plants to Yixin's specification; all others run in the Yixin workshop.
- 01Cold drawing (≤Ø28) / peeling (Ø30+)
- 02Roll straightening
- 03Centerless grinding
- 04Induction hardening
- 05Polishing
- 06Hard chrome
- 07Final polishing
Yixin workshopLong-term partner plant, to Yixin's specificationAll products can be CNC-sawn to length
RELEVANT PROCESS CAPABILITY
Technical baselines relevant to this product route
Typical process capability. Final values for each size are fixed on the confirmed drawing, specification and order.
TECHNICAL GUIDES
Technical topics to review before ordering
SERVICE
Export terms
How standard orders are handled. Volume and special requirements are written into the quotation.
- Minimum order
- 1 t per order; 20–50 kg sample orders available
- Lead time
- Cut-to-length from stock 3–5 days · non-standard diameters 7–10 days · custom heat treatment 10–20 days, plus sea-freight booking
- Trade & payment
- FOB Shanghai or Ningbo · T/T
- Packing
- Protective film, steel-strapped bundles, wooden cases or pallets for sea freight
- Documents
- Commercial invoice, packing list and mill certificate; certificate of origin arranged per order; third-party inspection on request
- Response
- Quotation reply within one working day
Inquire about 45 Steel Induction-Hardened Chrome Shaft
Send diameter, length, quantity or a drawing. We reply with grade, tolerance, chrome thickness and lead time.
Prepare RFQ